Summary

The report contains a detailed description of the power generation company’s business operations, history, corporate strategy, and business structure. This report contains a detailed SWOT analysis, information on key employees (executives), and major products and services.

Scope

- Major Power Plants (assets) - summarized and detailed information about the power plants (assets).
- Operational Metrics (capacity, generation, revenue, sales, number of consumers).
- Business description - A detailed description of the company’s operations and business divisions.
- Corporate strategy - GlobalData’s summarization of the company’s business strategy.
- SWOT analysis - A detailed analysis of the company’s strengths, weakness, opportunities and threats.
- Company history - Progression of key events associated with the company.
- Major products and services - A list of major products, services and brands
- Key employees - A list of the key executives and personnel heading key departments/functions.
- Executive biographies - A brief summary of the executives’ employment history.
- Financial deals - Coverage of key financial deals from 2006 onwards, depending upon information availability
- Important locations and subsidiaries - A list of key locations and subsidiaries of the company, including contact details.

* Note: Some sections may be missing if data is unavailable for the company.

Reasons to buy

- Gain key insights into the company for academic or business research purposes. Key elements such as SWOT analysis, corporate strategy and major products and services are incorporated in the profile to assist in various business decisions (M&A and JV).
- Identify potential customers and suppliers with this report’s analysis of the company’s business structure, operations, major products and services and business strategy.
- Understand and respond to competitors’ business structure and strategies with GlobalData’s detailed SWOT analysis. In this, the company’s core strengths, weaknesses, opportunities and threats are analyzed, providing an up to date objective view of the company.

Table Of Contents

Kyushu Electric Power Co., Inc. - Power Plants and SWOT Analysis, 2014 Update
Table of Contents
Table of Contents 2
List of Tables 8
Company Snapshot 10
Key Information 10
Company Overview 10
SWOT Snapshot 10
Operational Metrics 11
Kyushu Electric Power Co., Inc., Operational Metrics, By Capacity 11
Kyushu Electric Power Co., Inc., Operational Metrics, By Generation 11
Kyushu Electric Power Co., Inc., Operational Metrics, By Segmental Information 11
Kyushu Electric Power Co., Inc., Operational Metrics, By Sales 11
Kyushu Electric Power Co., Inc., Wind Farms 12
Kyushu Electric Power Co., Inc., Wind Farms, China 12
Kyushu Electric Power Co., Inc., Wind Farms, Japan 12
Kyushu Electric Power Co., Inc., Solar PV Parks 14
Kyushu Electric Power Co., Inc., Solar PV Parks, Japan 14
Kyushu Electric Power Co., Inc., Geothermal Power Plants 15
Kyushu Electric Power Co., Inc., Geothermal Power Plants, Indonesia 15
Kyushu Electric Power Co., Inc., Geothermal Power Plants, Japan 15
Kyushu Electric Power Co., Inc., Hydro Power Plants 17
Kyushu Electric Power Co., Inc., Hydro Power Plants, Japan 17
Kyushu Electric Power Co., Inc., Thermal Power Plants 24
Kyushu Electric Power Co., Inc., Thermal Power Plants, Japan 24
Kyushu Electric Power Co., Inc., Thermal Power Plants, Taiwan 25
Kyushu Electric Power Co., Inc., Thermal Power Plants, Vietnam 25
Business Description 26
Business Overview 26
Major Products and Services 27
History 28
SWOT Analysis 31
Overview 31
Kyushu Electric Power Co., Inc. Strengths 31
Diverse Power Generating System 31
Strong Liquidity Position 31
Integrated Operations 31
Kyushu Electric Power Co., Inc. Weaknesses 32
Negative Operational Performance 32
Rising Debt Burden 32
Kyushu Electric Power Co., Inc. Opportunities 32
Renewable Power Market: Japan 32
Demand for Green Energy Projects 33
Kyushu Electric Power Co., Inc. Threats 33
Environmental Regulations 33
Intense Competition in Japan 33
Seasonal Variations and Climate Conditions 33
Financial Ratios - Capital Market Ratios 34
Financial Ratios - Annual Ratios 34
Financial Ratios - Interim Ratios 36
Key Employees 37
Key Employee Biographies 39
Company Statement 40
Locations And Subsidiaries 41
Head Office 41
Other Locations and Subsidiaries 41
Financial Deals Landscape 43
Kyushu Electric Power Co., Inc., Deals Summary 43
Kyushu Electric Power Co., Inc., Power, Deal Details 46
Partnerships 46
NTPC Forms Joint Venture With Asian Development And Kyuden International 46
NTPC Forms Joint Venture With ADB And Kyushu Electric Power To Develop Renewable Power Projects 47
Japanese Companies Form Joint Venture 49
Ener1 Enters Into Memorandum Of Understanding With Kyushu Electric Power 52
NTPC Forms Joint Venture With Asian Development Bank, GE Energy, Kyushu Electric And Brookfield 53
Debt Offering 55
Kyushu Electric Power Announces Private Placement Of 0.281% 425th Bonds Due 2017 For US$293.5 Million 55
Kyushu Electric Power Announces Private Placement Of 1.064% 426th Bonds Due 2024 For US$391.3 Million 56
Kyushu Electric Power Announces Private Placement Of 0.959% 423rd Bonds Due 2019 For US$200.2 Million 57
Kyushu Electric Power Announces Private Placement Of 1.164% 422nd Bonds Due 2020 For US$200 Million 58
Kyushu Electric Power Announces Private Placement Of 1.055% 421st Domestic Straight Bonds For US$153 Million 59
Kyushu Electric Power Announces Private Placement Of 0.82% 420th Domestic Straight Bonds For US$510 Million 60
Kyushu Electric Power Announces Private Placement Of 0.65% 419th Domestic Straight Bonds For US$643 Million 61
Kyushu Electric Power Announces Private Placement Of 0.526% 418th Domestic Straight Bonds For US$376.7 Million 62
Kyushu Electric Prices Private Placement Of 0.641% Bonds Due 2017 For US$638 Million 63
Kyushu Electric Power Completes Public Offering Of 412th Domestic Straight Bonds For US$232.6 Million 64
Kyushu Electric Power Completes Public Offering Of 413th Domestic Straight Bonds For US$232.6 Million 65
Kyushu Electric Power Completes Public Offering Of 411th Domestic Straight Bonds For US$322.6 Million 66
Kyushu Electric Power Company Announces Private Placement Of 410th Bonds For US$225 Million 67
Kyushu Electric Power Completes Private Placement Of US$212 Million 1.483% 409th Domestic Corporate Straight Bonds, Due 2019 68
Kyushu Electric Power Completes Private Placement Of US$208 Million 1.672% 408th Domestic Corporate Straight Bonds Due 2019 69
Kyushu Electric Power Completes Private Placement Of 1.56% 407th Domestic Straight Bonds For US$336.51 Million 70
Kyushu Electric Power Completes Public Offering Of 1.04% 406th Domestic Straight Bonds For US$104.879 Million 71
Kyushu Electric Power Completes Private Placement Of 1.79% 405th Domestic Straight Bonds For US$310.33 Million 72
Kyushu Electric Power Completes Private Placement Of 1.24% 403rd Domestic Straight Bonds For US$248.74 Million 73
Kyushu Electric Power Completes Private Placement Of 1.88% 404th Domestic Straight Bonds For US$198.99 Million 74
Kyushu Electric Power Company Completes Private Placement Of US$275.18 Million 75
Kyushu Electric Power Company Completes Private Placement Of US$189.19 Million 76
Kyushu Electric Power Company Completes Private Placement Of US$195.44 Million 77
Kyushu Electric Power Company Completes Private Placement Of US$195.43 Million 78
Kyushu Electric Power Company Completes Private Placement Of US$187.66 Million 79
Asset Finance 80
Medco Energi, Ormat Technologies, Itochu And Kyushu Electric Complete Project Financing Of US$1.2 Billion For Sarulla Geothermal Power Plant In Indonesia 80
China Datang, Kyushu Electric Power And Sumitomo Complete Project Financing Of US$49 Million For Wind Farm, China 83
Acquisition 85
Lion Power Holdings Acquires Senoko Power From Temasek Holdings 85
Recent Developments 88
Kyushu Electric Power Co., Inc. - Recent Developments 88
Jul 31, 2012: Kyocera Establishes New Company To Operate 70 MW Solar Power Plant In Japan 88
Dec 24, 2008: KEPCI To Construct Third Nuclear Unit At Sendai Plant In Northern Japan 88
Sep 11, 2008: KEPCI To Enter Wind Power Generation In China 88
Aug 25, 2008: KEPCI To Build 3 MW Solar Power Generation Plant To Reduce CO2 Emissions 88
Aug 20, 2007: KEPCI Signs Memorandum With Medco Consortium For Sarulla Geothermal Project 89
Feb 20, 2007: NTPC Signs MoU With KYUSHU 89
Oct 28, 2013: Kyushu Electric Power Co., Inc. Actual Electricity Sales Volume in the First Six Months of FY2013 89
Apr 30, 2013: Kyushu Electric Reports Revenue Of JPY1.5 Trillion In Fiscal 2013 89
Jan 30, 2013: Kyushu Electric Reports Revenue Of JPY1.1 Trillion For Nine Months Ended December 31, 2012 89
Oct 30, 2012: Kyushu Electric Reports Revenue Of JPY763 Billion In H1 Fiscal 2013 90
Jul 31, 2012: Kyushu Electric Reports Revenue Of JPY353.8 Billion In Q1 Fiscal 2013 90
Apr 26, 2012: Kyushu Electric Reports Revenue Of JPY1.5 Trillion In Fiscal 2012 90
Jan 30, 2012: Kyushu Electric Reports Revenue Of JPY1.1 Trillion For Nine Months Ended December 31, 2011 90
Oct 27, 2011: Kyushu Electric Reports Revenue Of JPY742.3 Billion In H1 Fiscal 2012 90
Jul 27, 2011: Kyushu Electric Reports Revenue Of JPY343.9 Billion In Q1 Fiscal 2012 90
Apr 27, 2011: Kyushu Electric Reports Revenue Of JPY Trillion In Fiscal 2011 90
Jan 31, 2011: Kyushu Electric Reports Revenue Of JPY1.1 Trillion For Nine Months Ended December 31, 2010 90
Oct 28, 2010: KEPCI Reports Operating Revenues Of JPY736.78 Billion For H1 Fiscal 2011 90
Apr 30, 2010: KEPCI Reports Operating Revenues Of JPY1.44 Trillion For Fiscal 2010 91
Jan 29, 2010: KEPCI Reports Operating Revenues Of JPY1.06 Trillion For Nine Months Period Of Fiscal 2010 91
Jan 30, 2009: KEPCI Declares Nine Months Fiscal 2008 Results 91
Oct 31, 2008: KEPCI Declares Q2 Fiscal 2008 Results 91
Jan 29, 2008: KEPCI Declares Nine Months Fiscal 2007 Results 92
Oct 30, 2007: KEPCI Declares H1 Fiscal 2007 Results 92
Jul 31, 2007: KEPCI Declares Q1 Fiscal 2007 Results 94
Jan 31, 2007: KEPCI Declares Nine Months Fiscal 2006 Results 94
Oct 26, 2006: KEPCI Declares H1 Fiscal 2006 Results 94
Jul 31, 2006: KEPCI Declares Q1 Fiscal 2006 Results 94
Apr 27, 2006: KEPCI Declares Fiscal 2005 Results 94
Aug 05, 2014: Kyushu Electric unlikely to submit documents for Sendai nuclear reactors 95
Jul 16, 2014: NRA issues safety approval for Kyushu Electric's Sendai NPP in Japan 95
Jun 23, 2014: Kyushu Electric to submit documents for safety assessment at Sendai power plant 95
May 30, 2014: MHPS Receives Order for GTCC Power Generation Plant at Kyushu Electric Power Company's Shin Oita Thermal Power Station 95
Apr 23, 2014: Marubeni Corporation announces Start of Commercial Operation and Opening Ceremony of Mega-Solar Power Plant in Oita City 96
Apr 10, 2014: Kyushu Electric to submit documents Sendai nuclear power plant 96
Apr 03, 2014: NRA starts inspection at Sendai nuclear plant 97
Apr 02, 2014: Medco Power to spend about $1.3bn on nine major expansion projects in Indonesia 97
Mar 16, 2014: First Solar Completes 1.3MW(DC) Solar PV Power Plant at Kitakyushu-shi in Japan 97
Mar 13, 2014: Kyushu's two nuclear reactors gear up for summer restart 97
Mar 13, 2014: Toshiba's Lithium-ion Battery Energy Storage Systems Make Renewable Energy More Practical 98
Mar 13, 2014: NRA to speed up safety inspections at two Sendai reactors in Japan 98
Jul 12, 2013: Application for compatibility check to New Regulatory Requirements 99
Jun 12, 2013: NYK Trading Installs Solar Energy System In Hokkaido, Japan 99
Apr 03, 2013: TeraSol Obtains Approval From METI For 475 MW Solar PV Power Plant In Japan 99
Jan 24, 2013: JNFL Announces Receipt Of Low-level Radioactive Wastes From Genkai Power Station 99
Dec 27, 2012: Oji Holdings Plans To Invest JPY20 Billion To Construct Two Biomass Power Plants In Japan 99
Nov 30, 2012: Solar Frontier Supplies Solar Panels To Shimozuru Power Plant In Kagoshima Prefecture, Japan 100
Nov 28, 2012: Kyushu Electric Seeks Government's Approval For Hike In Residential And Commercial Electricity Prices 100
Nov 26, 2012: JNFL Announces Receipt Of Spent Fuel Assemblies From Three Nuclear Power Stations 100
Oct 26, 2012: Kyushu Electric Provides Update On Actual Electricity Sales Volume For H1 Fiscal 2012 100
Sep 18, 2012: Chubu Electric Suspends Power Generation At Unit 3 Of Atsumi Oil-fired Power Plant 101
Jun 08, 2012: Kyushu Electric Commences Commercial Operation Of Unit 2 At Karita Power Plant 101
May 25, 2012: Kyushu Electric Announces Update On Actual Electricity Sales Volume For FY2011-2012 101
Apr 25, 2012: Kyushu Electric Announces Update On Electricity Sales Volume For March 2012 101
Mar 26, 2012: Kyushu Electric Shuts Down Oil-fired Unit 2 At Sendai Power Station 101
Mar 06, 2012: Kyushu Electric Idles Gas-fired Unit 4 At Shin-Kokura Power Station 102
Feb 27, 2012: Kyushu Electric Announces Update On Actual Electricity Sales Volume For January 2012 102
Feb 22, 2012: Kyushu Electric To Increase Power Generation At Shin-Oita And Matsuura Power Plants 102
Feb 16, 2012: Kyushu Electric Starts Commercial Operations Of Kasegawa Hydropower Plant In Japan 102
Feb 03, 2012: TEPCO Supplies Around 500 MW Of Power To Kyushu Electric 102
Feb 02, 2012: Kyushu Electric To Resume Full Operations At Shin-Oita Gas-fired Power Station 102
Jan 30, 2012: Kyushu Electric To Set Up Three Diesel Generators At Buzen Oil-fired Power Station 102
Jan 30, 2012: Kyushu Electric To Restart 375 MW Fuel Oil-fired Unit At Karita Power Station In May 2012 103
Jan 27, 2012: Kyushu Electric Provides Update On Electricity Sales Volume In December 2011 103
Dec 31, 2011: Kyushu Electric Resumes Power Generation At Oil-fired Unit 2 Of Ainoura Power Project 103
Dec 29, 2011: Kyushu Electric Restarts Combined Cycle Gas-fired 1-4 Unit At Shin-Oita Power Project 103
Dec 27, 2011: Kyushu Electric's Combined Cycle Gas-fired 1-4 Unit At Shin-Oita Power Project Shuts Down Automatically 103
Dec 26, 2011: Kyushu Electric Begins Maintenance Of Unit 4 Of Genkai Nuclear Power Plant 103
Dec 26, 2011: Kyushu Electric To Idle Oil-fired Unit 2 At Ainoura Power Project In Nagasaki, Japan 103
Dec 26, 2011: Kyushu Electric Announces Electricity Sales Volume For November 2011 104
Dec 14, 2011: Kansai Electric Submits Stress Results For Three Nuclear Reactors 104
Dec 10, 2011: NISA Announces Leakage Of Radioactive Water From Kyushu Electric's Genkai No.3 Nuclear Reactor In Japan 104
Nov 29, 2011: Kyushu Electric To Idle Unit 1 At Genkai Nuclear Power Plant 104
Nov 28, 2011: KEPCI Announces Electricity Sales Volume For October 2011 104
Nov 23, 2011: Kyushu Electric Delays Shutdown Of Unit 4 At Genkai Nuclear Power Plant 105
Nov 17, 2011: JNFL Announces Update On Spent Fuel Transport 105
Nov 07, 2011: Kyushu Electric To Use Additional Fossil Fuel For Power Generation 105
Nov 01, 2011: Kyushu Electric To Resume Power Generation At Unit 4 Of Genkai Nuclear Power Plant 105
Oct 31, 2011: Coca-Cola System To Make Voluntary Efforts To Reduce Power Consumption Of Vending Machines As Part Of Winter Energy-Saving Measures 105
Oct 25, 2011: Kyushu Electric Reports Electricity Sales Volume Of 42,972 Million kWh In H1 2011 106
Oct 25, 2011: KEPCI Announces Electricity Sales Volume For September 2011 106
Oct 04, 2011: Kyushu Electric's Unit 4 At Genkai Nuclear Power Plant Shuts Down Automatically 106
Sep 28, 2011: KEPCI Announces Electricity Sales Volume For August 2011 106
Sep 15, 2011: JNFL Announces Update On Shipment Of Returned Vitrified Waste From Europe 107
Aug 30, 2011: Kyushu Electric To Begin Maintenance At Sendai No.2 Nuclear Reactor 107
Aug 29, 2011: Kyushu Electric Plans To Commence Operations Of Unit 1 At Karita Power Station On August 30, 2011 107
Aug 29, 2011: JNFL Provides Update On Spent Fuel Transport 107
Aug 25, 2011: KEPCI Announces Electricity Sales Volume For July 2011 107
Aug 23, 2011: KEPCI Shuts Operations Of Gas-fired Unit 4 At Kokura Power Station 107
Aug 23, 2011: Kyushu Electric Plans To Restart Coal-fired Unit 1 At Karita Power Plant 107
Aug 04, 2011: KEPCI Idles Operations Of 360 MW Coal-Based Power Plant Due To Problem In Boiler 108
Jul 14, 2011: KEPCI Postpones Restart Of Sendai Nuclear Power Station's Reactor No.1 108
Jul 01, 2011: Saga Prefecture Governor To Permit Restart Of KEPCI's No. 2 And No. 3 Nuclear Reactors 108
Jun 23, 2011: KEPCI Announces Electricity Sales Volume For May 2011 108
May 27, 2011: KEPCI Announces Electricity Sales Volume For April 2011 108
May 06, 2011: KEPCI To Close 890 MW Sendai No.1 Reactor For Maintenance 109
Apr 25, 2011: KEPCI Announces Electricity Sales Volume For March 2011 109
Apr 12, 2011: KEPCI Suspends Plans For Construction Of Third Nuclear Reactor In Kagoshima 109
Mar 28, 2011: KEPCI Announces Electricity Sales Volume For February 2011 109
Mar 24, 2011: KEPCI Delays Start Of Two Reactors At Genkai Nuclear Plant 109
Jan 26, 2011: Envia Delivers HCMR Battery Materials For Commercial Testing 109
Jan 24, 2011: Mitsubishi Announces FID On DSLNG Project In Indonesia 110
Jan 20, 2011: KEPCI Closes Coal-fueled No.2 Power Generating Unit At Reihoku Power Station In Japan 110
Jan 13, 2011: KEPCI Submits Application For Construction Of Unit 3 At Sendai Nuclear Power Plant 110
Jan 12, 2011: KEPCI Halts Operations Of No. 3 Reactor Of Genkai Nuclear Power Plant 111
Aug 12, 2010: KEPCI To Join Biomass Power Project In Tamil Nadu State, India 111
Aug 04, 2010: KEPCI Resumes Operations At Sendai Nuclear Plant's 890MW Reactor No. 2 111
Jan 28, 2010: Sakhalin Energy Delivers 100th Cargo Of Russian LNG To Japan 111
Dec 22, 2009: KEPCI Begins Mini-Hydropower Generation At Sendai Nuclear Power Plant 111
Dec 03, 2009: KEPCI's Reactor No. 3 At Genkai Nuclear Power Plant Operates At Full Capacity 112
Dec 01, 2009: Japan's Nuclear Utilization Rate Increases To 66.6% In November 2009: METI 112
Nov 05, 2009: KEPCI's Genkai Nuclear Power Plant Starts Using MOX Fuel For Generating Power 112
Nov 02, 2009: Japan's Nuclear Power Plant Utilization Rate Increases To 63.5%: METI 112
Oct 18, 2009: KEPCI Completes Loading Of MOX Fuel At Genkai Nuclear Power Plant, Japan 113
Oct 14, 2009: KEPCI To Launch MOX Fuel Into Unit 3 Reactor At Genkai Nuclear Power Plant, Japan 113
Oct 01, 2009: KEPCI Postpones Loading Of MOX Fuel Into Unit 3 Reactor At Genkai Nuclear Power Plant, Japan 113
Sep 24, 2009: Sumitomo Launches Commercial Operations Of Wind Power Station In Inner Mongolia, China 113
Aug 03, 2009: Japan's Nuclear Plant Usage Rises To 67.6% In July 2009 114
Jul 31, 2009: Datang Sino-Japan Receives Financing From ADB To Build 50 MW Wind Farm In China 114
Jul 07, 2009: ADB Finances Wind Farms To Help Cut PRC Greenhouse Gas Emissions 114
Jun 12, 2009: Japan Has 29,667 MW Nuclear Capacity Online As Of June 12, 2009 115
Jun 04, 2009: FEPC Forces Japanese Power Companies To Review 'Pluthermal' Plan 115
May 24, 2009: KEPCI Receives Second Shipment Of MOX Fuel For Genkai No. 3 Reactor 115
Mar 02, 2009: Japan Updates On Nuclear Plant Usage In February 2009 116
Jan 08, 2009: KEPCI To Invest $5.9 Billion On New Nuclear Reactor At Sendai Station 116
Mar 02, 2008: Sarulla Geothermal Power Project In Indonesia To Commence In 2009 117
Jun 11, 2013: Toshiba Participates In Biomass Energy Utilization Project Of Saga Incineration Plant 117
May 16, 2013: MOL Signs LNG Transport Agreement With Osaka Gas And Kyushu Electric Power 117
Apr 04, 2013: Sarulla Operations Wins Joint Operating Contract For 330 MW Sarulla Geothermal Power Project In Indonesia 118
Apr 13, 2012: North West Shelf Australia Extends Contract With Kyushu Electric To Supply LNG 118
Apr 12, 2012: Technip Wins €245m Contract From Chevron For Wheatstone Project In Australia 119
Apr 11, 2012: Clough AMEC Wins AUD30m Contract For Wheatstone Project In Western Australia 119
Feb 02, 2012: Clough Wins AUD350m Contract For Wheatstone Project 120
Dec 06, 2011: Ichthys LNG Signs LNG Sales And Purchase Agreement With Five Japanese Utility Companies 120
Sep 15, 2011: Apache And Its Partners Sign Agreements With Kyushu Electric To Sell Liquefied Natural Gas From Wheatstone Project 121
Jan 24, 2011: Chevron, Kyushu Electric Sign LNG Deal 121
Jan 19, 2011: Kyushu Electric Power Signs Gas Purchase Agreement With Donggi-Senoro LNG 122
Jan 26, 2010: Chevron Signs Multiple HOAs With Kyushu Electric Power For LNG 122
Jan 26, 2010: Kyocera To Supply 3 MW Of Solar Modules For Kyushu Electric 122
Sep 28, 2006: KEPCI Signs Agreement With Mitsubishi For MOX Fuel 122
Appendix 123
Report Scope 123
GlobalData Coverage 123
GlobalData's Methodology 123
Contact Us 124
Disclaimer 124

List of Tables
Kyushu Electric Power Co., Inc., Key Facts 10
Kyushu Electric Power Co., Inc., Operational Metrics, Capacity 11
Kyushu Electric Power Co., Inc., Operational Metrics, Generation 11
Kyushu Electric Power Co., Inc., Operational Metrics, Segmental Information 11
Kyushu Electric Power Co., Inc., Operational Metrics, Sales 11
Kyushu Electric Power Co., Inc., Wind Farms, China 12
Kyushu Electric Power Co., Inc., Wind Farms, Japan 12
Kyushu Electric Power Co., Inc., Solar PV Parks, Japan 14
Kyushu Electric Power Co., Inc., Geothermal Power Plants, Indonesia 15
Kyushu Electric Power Co., Inc., Geothermal Power Plants, Japan 15
Kyushu Electric Power Co., Inc., Hydro Power Plants, Japan 17
Kyushu Electric Power Co., Inc., Thermal Power Plants, Japan 24
Kyushu Electric Power Co., Inc., Thermal Power Plants, Taiwan 25
Kyushu Electric Power Co., Inc., Thermal Power Plants, Vietnam 25
Major Products and Services 27
Kyushu Electric Power Co., Inc., SWOT Analysis 31
Kyushu Electric Power Co., Inc., Ratios based on current share price 34
Kyushu Electric Power Co., Inc., Annual Ratios 34
Kyushu Electric Power Co., Inc., Interim Ratios 36
Kyushu Electric Power Co., Inc., Key Employees 37
Kyushu Electric Power Co., Inc., Other Locations 41
Kyushu Electric Power Co., Inc., Subsidiaries 41
Kyushu Electric Power Co., Inc., Deals Summary 43
NTPC Forms Joint Venture With Asian Development And Kyuden International 46
NTPC Forms Joint Venture With ADB And Kyushu Electric Power To Develop Renewable Power Projects 47
Japanese Companies Form Joint Venture 49
Ener1 Enters Into Memorandum Of Understanding With Kyushu Electric Power 52
NTPC Forms Joint Venture With Asian Development Bank, GE Energy, Kyushu Electric And Brookfield 53
Kyushu Electric Power Announces Private Placement Of 0.281% 425th Bonds Due 2017 For US$293.5 Million 55
Kyushu Electric Power Announces Private Placement Of 1.064% 426th Bonds Due 2024 For US$391.3 Million 56
Kyushu Electric Power Announces Private Placement Of 0.959% 423rd Bonds Due 2019 For US$200.2 Million 57
Kyushu Electric Power Announces Private Placement Of 1.164% 422nd Bonds Due 2020 For US$200 Million 58
Kyushu Electric Power Announces Private Placement Of 1.055% 421st Domestic Straight Bonds For US$153 Million 59
Kyushu Electric Power Announces Private Placement Of 0.82% 420th Domestic Straight Bonds For US$510 Million 60
Kyushu Electric Power Announces Private Placement Of 0.65% 419th Domestic Straight Bonds For US$643 Million 61
Kyushu Electric Power Announces Private Placement Of 0.526% 418th Domestic Straight Bonds For US$376.7 Million 62
Kyushu Electric Prices Private Placement Of 0.641% Bonds Due 2017 For US$638 Million 63
Kyushu Electric Power Completes Public Offering Of 412th Domestic Straight Bonds For US$232.6 Million 64
Kyushu Electric Power Completes Public Offering Of 413th Domestic Straight Bonds For US$232.6 Million 65
Kyushu Electric Power Completes Public Offering Of 411th Domestic Straight Bonds For US$322.6 Million 66
Kyushu Electric Power Company Announces Private Placement Of 410th Bonds For US$225 Million 67
Kyushu Electric Power Completes Private Placement Of US$212 Million 1.483% 409th Domestic Corporate Straight Bonds, Due 2019 68
Kyushu Electric Power Completes Private Placement Of US$208 Million 1.672% 408th Domestic Corporate Straight Bonds Due 2019 69
Kyushu Electric Power Completes Private Placement Of 1.56% 407th Domestic Straight Bonds For US$336.51 Million 70
Kyushu Electric Power Completes Public Offering Of 1.04% 406th Domestic Straight Bonds For US$104.879 Million 71
Kyushu Electric Power Completes Private Placement Of 1.79% 405th Domestic Straight Bonds For US$310.33 Million 72
Kyushu Electric Power Completes Private Placement Of 1.24% 403rd Domestic Straight Bonds For US$248.74 Million 73
Kyushu Electric Power Completes Private Placement Of 1.88% 404th Domestic Straight Bonds For US$198.99 Million 74
Kyushu Electric Power Company Completes Private Placement Of US$275.18 Million 75
Kyushu Electric Power Company Completes Private Placement Of US$189.19 Million 76
Kyushu Electric Power Company Completes Private Placement Of US$195.44 Million 77
Kyushu Electric Power Company Completes Private Placement Of US$195.43 Million 78
Kyushu Electric Power Company Completes Private Placement Of US$187.66 Million 79
Medco Energi, Ormat Technologies, Itochu And Kyushu Electric Complete Project Financing Of US$1.2 Billion For Sarulla Geothermal Power Plant In Indonesia 80
China Datang, Kyushu Electric Power And Sumitomo Complete Project Financing Of US$49 Million For Wind Farm, China 83
Lion Power Holdings Acquires Senoko Power From Temasek Holdings 85

View This Report »

Get Industry Insights. Simply.

  • Latest reports & slideshows with insights from top research analysts
  • 24 Million searchable statistics with tables, figures & datasets
  • More than 10,000 trusted sources
24/7 Customer Support

Talk to Veronica

+1 718 514 2762

Purchase Reports From Reputable Market Research Publishers
North Eastern Electric Power Corporation Limited - Power Plants and SWOT Analysis, 2016 Update

North Eastern Electric Power Corporation Limited - Power Plants and SWOT Analysis, 2016 Update

  • $ 1000
  • Company report
  • December 2016
  • by GlobalData

North Eastern Electric Power Corporation Limited - Power Plants and SWOT Analysis, 2016 Update Summary The report contains a detailed description of the power generation company’s business operations, ...

Electric Power Development Co., Ltd. - Power Plants and SWOT Analysis, 2016 Update

Electric Power Development Co., Ltd. - Power Plants and SWOT Analysis, 2016 Update

  • $ 1000
  • Company report
  • December 2016
  • by GlobalData

Electric Power Development Co., Ltd. - Power Plants and SWOT Analysis, 2016 Update Summary The report contains a detailed description of the power generation company’s business operations, history, corporate ...

Kansas Electric Power Cooperative, Inc. - Power Plants and SWOT Analysis, 2016 Update

Kansas Electric Power Cooperative, Inc. - Power Plants and SWOT Analysis, 2016 Update

  • $ 1000
  • Company report
  • December 2016
  • by GlobalData

Kansas Electric Power Cooperative, Inc. - Power Plants and SWOT Analysis, 2016 Update Summary The report contains a detailed description of the power generation company’s business operations, history, ...


ref:plp2014

Reportlinker.com © Copyright 2017. All rights reserved.

ReportLinker simplifies how Analysts and Decision Makers get industry data for their business.