1 Table of Contents
1 Table of Contents 2
1.1 List of Tables 4
1.2 List of Figures 4
2 Introduction 5
2.1 GlobalData Report Guidance 5
3 Chile, Power Market, Business Propensity Indicator Methodology 6
3.1 Methodology for Evaluating the Business Propensity Indicator for Chile in Latin American 6
3.1.1 Supply Security 6
3.1.2 Regulatory Scenario 6
3.1.3 Infrastructure 7
3.1.4 Macroeconomic Scenario 8
3.1.5 Competitive Scenario 9
3.1.6 Future Potential 9
3.2 Methodology Adopted to Arrive at Final Rank 10
4 Chile, Power Market, Business Propensity Indicator 12
4.1 Chile, Power Market, Supply Security 12
4.2 Chile, Power Market, Regulatory Scenario 12
4.3 Chile, Power Market, Infrastructure 12
4.4 Chile, Power Market, Degree of Competition 12
4.5 Chile, Power Market, Macro-Economic Factors 13
4.6 Chile, Power Market, Future Potential 13
4.7 Chile, Power Market, Business Propensity Indicator Ranking 14
5 Chile, Power Market Analysis, 2000–2030 15
5.1 Chile, Power Market, Cumulative Installed Capacity, 2000–2030 15
5.1.1 Cumulative Installed Capacity: Breakdown by Type of Power Plant 15
5.1.2 Cumulative Installed Capacity and Annual Power Generation 16
5.1.3 Thermal Installed Capacity and Thermal Power Generation, 2000–2030 18
5.1.4 Cumulative Hydro Installed Capacity and Hydropower Generation, 2000–2030 20
5.1.5 Cumulative Renewable Installed Capacity and Renewable Power Generation, 2000–2030 22
5.2 Chile, Power Market, Import and Export Scenario 24
5.3 Chile, Power Market, Annual Power Consumption, 2000–2030 25
5.4 Chile, Power Market, Demand and Consumption Scenario 27
6 Chile, Power Market, Infrastructure 28
6.1 Chile, Power Market, Leading Active Power Projects 28
6.1.1 Leading Thermal Power Projects 28
6.1.2 Leading Hydropower Projects 29
6.1.3 Leading Renewable Power Projects 30
6.2 Chile, Power Market, Leading Upcoming Power Projects 31
6.2.1 Leading Thermal Power Projects 31
6.2.2 Leading Hydropower Projects 32
6.2.3 Leading Renewable Power Projects 33
6.3 Chile, Power Market, Transmission and Distribution Infrastructure Overview 34
6.3.1 Northern Interconnected System 34
6.3.2 Central Interconnected System 34
6.3.3 Sistema de Aysén 34
6.3.4 Sistema de Magallanes 35
6.3.5 Reliability of the Power System 35
6.4 Chile, Power Market, Electricity Trade 36
7 Chile, Power Market, Regulatory Structure 37
7.1 Chile, Power Market, Regulatory Structure Overview 37
7.1.1 Chile, Power Market, Liberalization 37
7.1.2 Chile, Power Market, Energy Efficiency 37
7.2 Chile, Power Market, Renewable Energy 38
7.2.1 Short Laws I & II 38
7.2.2 Other Renewable Incentives 38
7.3 Chile, Power Market, National Energy Strategy (2012–2030) 39
8 Chile, Power Market, Competitive Landscape 41
8.1 Chile, Power Market, Market Shares of the Major Power Companies by Cumulative Installed Capacity, 2011 41
8.2 Chile, Power Market, Key Company: Endesa S.A. 42
8.2.1 Endesa S.A., Company Overview 42
8.2.2 Endesa S.A., Business Description 42
8.2.3 Endesa S.A., SWOT Analysis 43
8.3 Chile, Power Market, Key Company: Colbun S.A. 46
8.3.1 Colbun S.A., Company Overview 46
8.3.2 Colbun S.A., Business Description 46
8.3.3 Colbun S.A., SWOT Analysis 47
8.4 Chile, Power Market, Key Company: AES Gener S.A. 50
8.4.1 AES Gener S.A., Company Overview 50
8.4.2 AES Gener S.A., Business Description 50
8.4.3 AES Gener S.A., SWOT Analysis 51
8.4.4 E.CL S.A., Company Overview 54
8.5 Chile, Power Market, Key Company: E.CL S.A., 55
8.5.1 E.CL S.A., Business Description 55
8.5.2 E.CL S.A., SWOT Analysis 56
9 Appendix 59
9.1 Market Definitions 59
9.1.1 Power 59
9.1.2 Installed Capacity 59
9.1.3 Active Installed Capacity 59
9.1.4 Electricity Generation 59
9.1.5 Electricity Consumption 59
9.1.6 Thermal Power Plant 59
9.1.7 Hydropower Plant 59
9.1.8 Nuclear Power 59
9.1.9 Renewable Energy Resources 59
9.2 Abbreviations 60
9.3 Bibliography 60
9.4 GlobalData’s Methodology 61
9.4.1 Coverage 61
9.4.2 Secondary research and analysis 61
9.4.3 Primary Research and Analysis 61
9.5 Contact Us 62
9.6 Disclaimer 62
List of Tables
Table 1: Ease of Doing Business – Categories and Definitions 8
Table 2: Country Risk – Categories and Sub-categories 9
Table 3: BPI Scoring Parameters 11
Table 4: Power Market, Chile, Installed Capacity by Type of Power Plant (%), 2011 15
Table 5: Power Market, Chile, Cumulative Installed Capacity (MW) and Annual Power Generation (GWh), 2000–2030 17
Table 6: Power Market, Chile, Thermal Installed Capacity (MW) and Thermal Power Generation (GWh), 2000–2030 19
Table 7: Power Market, Chile, Cumulative Hydro Installed Capacity (MW) an Hydropower Generation (GWh), 2000–2030 21
Table 8: Power Market, Chile, Renewable Installed Capacity (MW) and Renewable Power Generation (GWh), 2000–2030 23
Table 9: Power Market, Chile, Total Annual Imports and Exports (GWh), 2000–2010 24
Table 10: Power Market, Chile, Annual Power Consumption (GWh), 2000–2030 26
Table 11: Power Market, Chile, Estimated Breakdown of Electricity Consumption, by Sector (%), 2011 27
Table 12: Power Market, Chile, Leading Active Thermal Power Projects (MW) 28
Table 13: Power Market, Chile, Leading Active Hydropower Projects (MW) 29
Table 14: Power Market, Chile, Leading Active Renewable Power Projects (MW) 30
Table 15: Power Market, Chile, Upcoming Leading Upcoming Thermal Power Projects (MW) 31
Table 16: Power Market, Chile, Upcoming Leading Hydropower Projects (MW) 32
Table 17: Power Market, Chile, Upcoming Leading Renewable Power Projects (MW) 33
Table 18: Power Market, Chile, Transmission Line Length (Ckm), 2000–2020 35
Table 19: Power Market, Chile, Market Shares of the Major Market Players (%), 2011 41
Table 20: Endesa S.A., SWOT Analysis 43
Table 21: Colbun S.A., SWOT Analysis 47
Table 22: AES Gener S.A., SWOT Analysis 51
Table 23: E.CL S.A., SWOT Analysis 56
Table 24: Abbreviations 60
List of Figures
Figure 1: Weights Assigned to the Six Factors (%), 2000–2020 10
Figure 2: Power Market, Chile, Business Propensity Indicator Ranking 14
Figure 3: Power Market, Chile, Installed Capacity by Type of Power Plant (%), 2011 15
Figure 4: Power Market, Chile, Cumulative Installed Capacity (MW) and Annual Power Generation (GWh), 2000–2030 16
Figure 5: Power Market, Chile, Thermal Installed Capacity (MW) and Thermal Power Generation (GWh), 2000–2030 18
Figure 6: Power Market, Chile, Cumulative Hydro Installed Capacity (MW) and Hydropower Generation (GWh), 2000–2030 20
Figure 7: Power Market, Chile, Renewable Installed Capacity (MW) and Renewable Power Generation (GWh), 2000–2030 22
Figure 8: Power Market, Chile, Total Annual Imports and Exports (GWh), 2000–2010 24
Figure 9: Power Market, Chile, Annual Power Consumption (GWh), 2000–2030 25
Figure 10: Power Market, Chile, Estimated Breakdown of Electricity Consumption by Sector (%), 2011 27
Figure 11: Power Market, Chile, Market Shares of the Major Market Players (%), 2011 41
Companies Mentioned
Endesa S.A.
Colbun S.A.
AES Gener S.A.
E.CL S.A.