1. Market Research
  2. > Energy & Environment
  3. > Energy
  4. > Coal Market Trends
  5. > GoI – Serang Coal Fired Power Plant 670 MW – Banten - Construction Project Profile

Synopsis
The "GoI – Serang Coal Fired Power Plant 670 MW – Banten - Construction Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "GoI – Serang Coal Fired Power Plant 670 MW – Banten - Construction Project Profile" is part of World Market Intelligence's database of 25,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $50 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
World Market Intelligence's "GoI – Serang Coal Fired Power Plant 670 MW – Banten - Construction Project Profile" is a crucial resource for industry executives and anyone looking to access key information about the GoI – Serang Coal Fired Power Plant 670 MW – Banten construction project.

World Market Intelligence's "GoI – Serang Coal Fired Power Plant 670 MW – Banten - Construction Project Profile" report utilizes a wide range of primary and secondary sources, which are analyzed and presented in a consistent and easily accessible format. World Market Intelligence strictly follows a standardized research methodology to ensure high levels of data quality and these characteristics guarantee a unique report.

Scope
This report provides details on the GoI – Serang Coal Fired Power Plant 670 MW – Banten - Construction Project Profile including:

- Project description, overview and location.

- Ownership structure, funding status and key funding news for the project.

- Tender information.

- Key project contact details.

Reasons To Buy
- Gain insight into the project.

- Monitor the latest project developments.

- Identify key project contacts.


Table Of Contents

GoI - Serang Coal Fired Power Plant 670 MW - Banten - Construction Project Profile
Table of Contents
1 Project Scope
1.1 Overview
1.2 Operating Metrics
1.3 Location
1.4 Project Owner
1.5 Project Description
1.6 Project Background
1.7 Latest Update
2 Tender Info
3 Key Contacts
3.1 Project Owner
3.2 Advisors
3.3 Main Contractor Contacts
4 Appendix
4.1 About World Market Intelligence
4.2 Disclaimer

List of Tables
Table 1: GoI - Serang Coal Fired Power Plant 670 MW - Banten, Key Facts
Table 2: GoI - Serang Coal Fired Power Plant 670 MW - Banten, Location Details
Table 3: GoI - Serang Coal Fired Power Plant 670 MW - Banten , Tender Info
Table 4: GoI - Serang Coal Fired Power Plant 670 MW - Banten, Project Owner Contacts
Table 5: GoI - Serang Coal Fired Power Plant 670 MW - Banten , Advisors
Table 6: GoI - Serang Coal Fired Power Plant 670 MW - Banten , Main Contractor Contacts

View This Report »

Get Industry Insights. Simply.

  • Latest reports & slideshows with insights from top research analysts
  • 24 Million searchable statistics with tables, figures & datasets
  • More than 10,000 trusted sources
24/7 Customer Support

Talk to Ahmad

+1 718 618 4302

Purchase Reports From Reputable Market Research Publishers
CDT – Huludao Ultra-Super Critical Coal-Fired Power Plant 700 MW – Liaoning - Construction Project Profile

CDT – Huludao Ultra-Super Critical Coal-Fired Power Plant 700 MW – Liaoning - Construction Project Profile

  • $ 75
  • Industry report
  • November 2016
  • by Timetric

Synopsis "CDT – Huludao Ultra-Super Critical Coal-Fired Power Plant 700 MW – Liaoning - Construction Project Profile" contains information on the scope of the project including project overview and ...

PTBA/ANTAM – East Halmahera Coal Power Plant 600 MW – North Maluku Province - Construction Project Profile

PTBA/ANTAM – East Halmahera Coal Power Plant 600 MW – North Maluku Province - Construction Project Profile

  • $ 75
  • Industry report
  • November 2016
  • by Timetric

Synopsis "PTBA/ANTAM – East Halmahera Coal Power Plant 600 MW – North Maluku Province - Construction Project Profile" contains information on the scope of the project including project overview and ...

CPI – Boffa Coal Fired Power Plant 340 MW – Boké Prefecture - Construction Project Profile

CPI – Boffa Coal Fired Power Plant 340 MW – Boké Prefecture - Construction Project Profile

  • $ 75
  • Industry report
  • November 2016
  • by Timetric

Synopsis "CPI – Boffa Coal Fired Power Plant 340 MW – Boké Prefecture - Construction Project Profile" contains information on the scope of the project including project overview and location. The ...


Download Unlimited Documents from Trusted Public Sources

The future of the Energy Industry in the US

  • March 2017
    36 pages
  • Energy  

    Coal  

    Renewable Energ...  

  • United States  

    North America  

View report >

Coal Industry in China

  • March 2017
    20 pages
  • Coal  

  • China  

    United States  

    Asia  

View report >

Coal Industry in Australia

  • March 2017
    36 pages
  • Energy  

    Electricity  

    Power Generatio...  

  • Australia  

View report >

Global Coal Industry

2 months ago

Related Market Segments :

Coal-Fired Power Generation
Construction

ref:plp2015

Reportlinker.com © Copyright 2017. All rights reserved.

ReportLinker simplifies how Analysts and Decision Makers get industry data for their business.