1. Market Research
  2. > Energy & Environment
  3. > Energy
  4. > Coal Energy Market Trends
  5. > Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo - Construction Project Profile

Synopsis
The "Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo - Construction Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo - Construction Project Profile" is part of World Market Intelligence's database of 25,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $50 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
World Market Intelligence's "Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo - Construction Project Profile" is a crucial resource for industry executives and anyone looking to access key information about the Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo construction project.

World Market Intelligence's "Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo - Construction Project Profile" report utilizes a wide range of primary and secondary sources, which are analyzed and presented in a consistent and easily accessible format. World Market Intelligence strictly follows a standardized research methodology to ensure high levels of data quality and these characteristics guarantee a unique report.

Scope
This report provides details on the Eskom – Medupi Coal-Fired Power Plant: Phase I 2400 MW – Limpopo - Construction Project Profile including:

- Project description, overview and location.

- Ownership structure.

- Information on related projects and tendering information.

- Key project contact details.

Reasons To Buy
- Gain insight into the project.

- Monitor the latest project developments.

- Identify key project contacts.


Table Of Contents

Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo - Construction Project Profile
Table of Contents
1 Project Scope
1.1 Overview
1.2 Operating Metrics
1.3 Location
1.4 Project Owner
1.4.1 Ownership
1.5 Project Description
1.6 Project Background
1.7 Latest Update
2 Tender Info
3 Related Projects, Contracts and Tendering Information
3.1 Sub Projects and Contracts
4 Key Contacts
4.1 Project Owner
4.2 Main Contractor Contacts
4.3 Consultant Contacts
5 Appendix
5.1 About World Market Intelligence
5.2 Disclaimer

List of Tables
Table 1: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo, Key Facts
Table 2: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo, Location Details
Table 3: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo , Tender Info
Table 4: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo, Sub Projects and Contracts
Table 5: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo, Project Owner Contacts
Table 6: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo , Main Contractor Contacts
Table 7: Eskom - Medupi Coal-Fired Power Plant: Phase I 2400 MW - Limpopo , Consultant Contacts

View This Report »

Get Industry Insights. Simply.

  • Latest reports & slideshows with insights from top research analysts
  • 24 Million searchable statistics with tables, figures & datasets
  • More than 10,000 trusted sources
24/7 Customer Support

Talk to Ahmad

+1 718 618 4302

Purchase Reports From Reputable Market Research Publishers
Adani – Coal-Fired Power Plant 3000 MW – India - Construction Project Profile

Adani – Coal-Fired Power Plant 3000 MW – India - Construction Project Profile

  • $ 75
  • Industry report
  • August 2016
  • by Timetric

Synopsis "Adani – Coal-Fired Power Plant 3000 MW – India - Construction Project Profile" contains information on the scope of the project including project overview and location. The profile also details ...

Hubco – Thar Coal-Fired Power Plant 330 MW – Sindh - Construction Project Profile

Hubco – Thar Coal-Fired Power Plant 330 MW – Sindh - Construction Project Profile

  • $ 75
  • Industry report
  • August 2016
  • by Timetric

Synopsis "Hubco – Thar Coal-Fired Power Plant 330 MW – Sindh - Construction Project Profile" contains information on the scope of the project including project overview and location. The profile also ...

Global and Chinese Residential Coal Fired Power Generation Industry, 2016 Market Research Report

Global and Chinese Residential Coal Fired Power Generation Industry, 2016 Market Research Report

  • $ 2800
  • Industry report
  • July 2016
  • by Prof Research

The 'Global and Chinese Residential Coal Fired Power Generation Industry, 2011-2021 Market Research Report' is a professional and in-depth study on the current state of the global Residential Coal Fired ...


ref:plp2015

Reportlinker.com © Copyright 2016. All rights reserved.

ReportLinker simplifies how Analysts and Decision Makers get industry data for their business.