The "WBPDCL – Bandel Thermal Power Plant Renovation 210 MW – West Bengal - Construction Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "WBPDCL – Bandel Thermal Power Plant Renovation 210 MW – West Bengal - Construction Project Profile" is part of World Market Intelligence's database of 25,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $50 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
World Market Intelligence's "WBPDCL – Bandel Thermal Power Plant Renovation 210 MW – West Bengal - Construction Project Profile" is a crucial resource for industry executives and anyone looking to access key information about the WBPDCL – Bandel Thermal Power Plant Renovation 210 MW – West Bengal construction project.

World Market Intelligence's "WBPDCL – Bandel Thermal Power Plant Renovation 210 MW – West Bengal - Construction Project Profile" report utilizes a wide range of primary and secondary sources, which are analyzed and presented in a consistent and easily accessible format. World Market Intelligence strictly follows a standardized research methodology to ensure high levels of data quality and these characteristics guarantee a unique report.

Scope
This report provides details on the WBPDCL – Bandel Thermal Power Plant Renovation 210 MW – West Bengal - Construction Project Profile including:

- Project description, overview and location.

- Ownership structure, funding status and key funding news for the project.

- Key project contact details.

Reasons To Buy
- Gain insight into the project.

- Monitor the latest project developments.

- Identify key project contacts.


Table Of Contents

WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal - Construction Project Profile
Table of Contents
1 Project Scope
1.1 Overview
1.2 Operating Metrics
1.3 Location
1.4 Project Owner and Funding
1.4.1 Ownership
1.4.2 Funding Details
1.5 Fundings
1.6 Project Description
1.7 Project Background
1.8 Latest Update
2 Tender Info
3 Key Contacts
3.1 Project Owner
3.2 Main Contractor Contacts
3.3 Consultant Contacts
4 Appendix
4.1 About World Market Intelligence
4.2 Disclaimer

List of Tables
Table 1: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal, Key Facts
Table 2: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal, Location Details
Table 3: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal, Funding Details
Table 4: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal, Fundings
Table 5: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal , Tender Info
Table 6: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal, Project Owner Contacts
Table 7: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal , Main Contractor Contacts
Table 8: WBPDCL - Bandel Thermal Power Plant Renovation 210 MW - West Bengal , Consultant Contacts

View This Report »

Get Industry Insights. Simply.

  • Latest reports & slideshows with insights from top research analysts
  • 24 Million searchable statistics with tables, figures & datasets
  • More than 10,000 trusted sources
24/7 Customer Support

Talk to Ahmad

+1 718 618 4302

Purchase Reports From Reputable Market Research Publishers
Industrial Boilers Market by End-use Industry, Type, Boiler Horsepower, Fuel Type, and Region - Global Forecast to 2026

Industrial Boilers Market by End-use Industry, Type, Boiler Horsepower, Fuel Type, and Region - Global Forecast to 2026

  • $ 5650
  • Industry report
  • December 2016
  • by MarketsandMarkets

“Industrial boilers market is projected to reach USD 17.77 billion by 2026” The industrial boilers market is estimated to be USD 10.92 billion in 2016 and is projected to reach USD 17.77 billion by ...

Boilers, Turbines and Generators (BTG) for Thermal Power - Market Size, Competitive Landscape, Key Country Analysis and Forecasts to 2020

Boilers, Turbines and Generators (BTG) for Thermal Power - Market Size, Competitive Landscape, Key Country Analysis and Forecasts to 2020

  • $ 3995
  • Industry report
  • November 2016
  • by Global Data

Boilers, Turbines and Generators (BTG) for Thermal Power - Market Size, Competitive Landscape, Key Country Analysis and Forecasts to 2020 Summary GlobalData’s latest report “Boilers, Turbines and Generators ...

SMC – Sariaya Coal-Fired Thermal Power Plant 600 MW – Calabarzon - Construction Project Profile

SMC – Sariaya Coal-Fired Thermal Power Plant 600 MW – Calabarzon - Construction Project Profile

  • $ 75
  • Industry report
  • November 2016
  • by Timetric

Synopsis "SMC – Sariaya Coal-Fired Thermal Power Plant 600 MW – Calabarzon - Construction Project Profile" contains information on the scope of the project including project overview and location. ...


Download Unlimited Documents from Trusted Public Sources

The future of the Energy Industry in China

  • January 2017
    16 pages
  • Energy  

    Heating Equipme...  

  • China  

View report >

Construction Industry in India - Forecast

  • January 2017
    6 pages
  • Construction  

  • India  

View report >

Concrete Industry in India

  • January 2017
    20 pages
  • Concrete  

    Green Building ...  

    Thermal Power  

  • India  

    United States  

View report >

Global Hvac Industry

19 days ago

Boiler Industry

2 months ago

Related Market Segments :

Thermal Power

ref:plp2015

Reportlinker.com © Copyright 2017. All rights reserved.

ReportLinker simplifies how Analysts and Decision Makers get industry data for their business.